
TotalEnergies completed its entry into the Mopane discovery on 3 September and now operates Namibia’s two largest oil finds. Appraisal drilling starts in the second half of 2026 — and Equinor has just bought its way into the same basin.
On 3 September TotalEnergies completed the acquisition of a 40% operated interest in PEL 83, the offshore licence that holds the Mopane discovery in Namibia’s Orange Basin, from Portugal’s Galp. The deal was agreed in December 2025 and approved by Namibia’s Ministry of Industries, Mines and Energy in mid-July; the company thanked the authorities for their “swift approval”. Galp keeps 40%, with the national oil company Namcor and Custos on 10% each. In exchange Galp takes 10% of PEL 56, home of the Venus discovery, and 9.39% of PEL 91, and TotalEnergies will carry half of Galp’s future development costs at Mopane.
The numbers explain the interest. Mopane’s discoveries are estimated at 10 billion barrels of oil equivalent or more. A three-well appraisal campaign is due to begin in the second half of 2026, with a final investment decision targeted for 2028 and first oil anticipated in 2032. “This transaction positions TotalEnergies as the operator of Namibia’s two largest oil discoveries,” said chief executive Patrick Pouyanné, who described the move as a milestone towards building a major production hub in the country.
Why it matters
Namibia has not yet produced a barrel. What has changed in 2026 is who is lining up to make sure it does. Besides TotalEnergies’ consolidation, Norway’s Equinor has taken its first position in the country, buying 17.4% of PEL 90 from a Chevron subsidiary alongside QatarEnergy and Namcor, with a drill-ready prospect scheduled for testing before the end of the year. Majors do not swap assets and commit rigs to a frontier basin they doubt. And the pattern — one operator across neighbouring discoveries, the state company with a share of each — is the shape of a hub rather than a single field, which is what tends to bring the cost per barrel down and the start date forward.
For a country of about three million people the timeline matters as much as the volume. Six years to first oil is long enough to prepare the ports at Walvis Bay and Lüderitz, the supply chain and the skills, and short enough that the decisions taken now will bind. The obvious comparison is Guyana, which went from discovery in 2015 to first oil in 2019. Namibia’s version is deeper water and a slower clock — which, for a government that wants local companies ready before the revenue arrives, is not a disadvantage.
Sources: TotalEnergies · World Oil · Journal of Petroleum Technology · Africa Oil+Gas Report · Offshore Engineer